Serving the entire state of Florida — free walkthrough & estimate

Bathroom Remodeling completed by Honchar Remodeling in Florida

Home › Bathroom Remodeling

Bathroom Remodeling

Tub-to-shower conversions and full remodels across Florida — waterproofed properly, tiled properly, and finished when we said it would be.

A bathroom is the hardest room in the house to get right and the easiest one to get wrong in a way you only discover two years later. Almost every bathroom we tear out has the same failure behind the tile: waterproofing that was rushed, or skipped.

So that is where we spend the time. A bonded waterproof membrane over the whole wet area, a properly sloped pan, seams and corners banded, and a flood test before a single tile goes on. It is the part you will never see, and it is the part that decides whether the room lasts twenty years or five.

What’s included

  • Demo and haul-away, floors and hallways protected the whole way
  • Tub-to-shower conversions, including curbless and low-threshold
  • Full waterproofing system with a flood test before tiling
  • Tile setting — subway, large format, mosaic, niches and benches
  • Vanities, mirrors, lighting, fixtures and glass
  • Drywall, texture and paint made good throughout

Before & after

The same room, from the same spot

We mark the floor before we start so the after photo is taken from exactly where the before was. Drag the handle.

Before: bathroom at drywall stage with bare walls and an unfinished floor After: the same room with a freestanding tub, walk-in shower and double vanity Before After

Master bathroom

Bare drywall to a finished master

Taken from drywall through waterproofing, tile, vanity and fixtures.

Common questions

Things people ask before they call

How long does a bathroom remodel take?

A straightforward tub-to-shower conversion is usually 5 to 7 working days. A full master taken back to studs runs 9 to 14. We give you the actual dates in the quote, and if something slips you hear it from us first rather than finding out when nobody turns up.

Can we still use the bathroom while you work?

Not the one we are working in. If it is your only bathroom we will tell you that upfront and sequence the job to keep the downtime as short as possible — usually two to three days without a usable shower rather than the whole build.

Do you handle the plumbing and electrical?

We coordinate licensed trades for anything that needs a permit and pull it into one schedule, so you are not chasing three companies. It appears as a line on your quote rather than a surprise later.

What does the guarantee actually cover?

Anything not finished to your standard, we come back and correct it free. That is written on the quote you sign. It is not a limited-time warranty and it does not expire when we drive away.

Get a real number for your bathroom remodeling

Send a photo and a couple of lines. We’ll come out, look properly, and quote it in writing.

Free walkthrough·No obligation·Same business day reply